Description
Distribution :
Controlled
X
Uncontrolled
Document status : ( Information )
F.C
( Comments )
F.E
( Execution ) X
X
TO :
F.I
F.A
Available on computer
EWBPC
( Application )
DISTANCE PROTECTION RELAY
Title :
NARI PCS-902
Type : FIELD TEST GUIDE
Contract : BORGOS SUBSTATION AND INTERCONNECTION WORK PROJECT
BURGOS Contract specific number
Name
by on by on by on A by Satria on 17-Jul-14 Ind Rev Prepared
Pasti Malau
BORIS
7/17/2014
17-Jul-14
Checked
Approved
14 Sheets
Modification
PT. ALSTOM GRID FA - SECTION
J K T
A T
I
0
8
H
D A F
0 0 0 0
Place of issue File number This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID
Ref.
FA - Section
CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
2
Rev.
A
A T : P/87L
SUMMARY
SHEET
REVISION
1
PURPOSE OF TESTS
3
A
2
TEST EQUIPMENT REQUIRED
3
A
3
PRELIMINARY CHECK
3
A
4
SETTING CHECK
6
A
5
TESTING PROCEDURE
6
A
5.1. CURRENT MEASUREMENT TESTING
6
A
5.2. DIFFERENTIAL ELEMENT TESTING
6
A
5.3. TIMING TESTING
6
A
FINAL CHECK ATTACHMENT
7
A
6 7
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID FA - Section
Ref. CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
3
Rev.
A
A T : P/87L
1 - PURPOSE OF TESTS The test is intended to check correct relay operation in accordance to manufacturer publication or technical guide publication PCS-902D_Instruction Manual_EN_General_X_R1.01
2 - TEST EQUIPMENT REQUIRED -
Time meter
-
Digital multimeter
-
Phase angle meter
-
Secondary injection capable for simulation fault (ex, OMICRON CMC 256/356)
-
A multi finger test plug type MML B01 for use with test block type MMLG (optional)
-
A portable computer with apporiate software
3 - PRELIMINARY CHECKS 3.1
Visual Check -
Carefully examine the relay to see that no physical damage has occurred since installation. Ensure that earthing connection at the rear of relay case, are used to
3.2
Wiring -
Check if the external wiring corresponds to the apporiate relay diagram or assembly diagram
-
When the relay is withdraw from its case,use continiuty tester to check if the current short circuit (phase and earth CT's) between the terminal indicated on the wiring diagram are closed.
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID FA - Section
Ref. CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
4
Rev.
A
A T : P/87L
3.3
Binary Input - This test checks that all the opto-isolated inputs on the relay are functioning correctly. NARI PCS-931_X have up to 36 binary inputs - Ensure that the relay is still in test mode by viewing cell (COMMISSION TESTS, Test Mode) to ensure that it is set to ‘Blocked’.
3.4
Binary Output - This test checks that all the output relays are functioning correctly. NARI PCS-931_X have up to 55 binary inputs - Ensure that the relay is still in test mode by viewing cell (COMMISSION TESTS, Test Mode) to ensure that it is set to ‘Blocked’.
3.5
Rear communications port - This test should only be perform where the relay is to be accessed from a remote location and will vary depending on the communication standard being adopted. It is not the intention of the test to verify the operation of complete system from the relay to the remote location, just the relay's rear communications port and any protocol converter nessesary.
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID FA - Section
Ref. CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
5
Rev.
A
A T : P/87L
Courier Communications Port If a K-Bus to EIA(RS)232 KITZ protocol converter is installed, connect a portable PC running the appropriate software to the incoming (remote from relay) side of the protocol converter. The terminal numbers for the relay’s K-Bus port are given in the table below.
Ensure that the communications baud rate and parity settings in the application software are set the same as those on the protocol converter (usually a KITZ but could be a SCADA RTU). The relays courier address in cell [0E02: COMMUNICATIONS, Remote Access] must be set to a value between 1 and 254. Check that communications can be established with this relay using the portable PC. Ethernet Port
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID
Ref.
FA - Section
CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
6
Rev.
A
A T : P/87L
4. SETTING CHECKS The setting checks ensure that all of the application-specific relay settings (i.e. both the relay’s function and programmable scheme logic settings), for the particular installation, have been correctly applied to the relay. Note: The trip circuit should remain isolated during these checks to prevent accidental operation of the associated circuit breaker. Apply the protection setting based on Approved Calculation Note and the PSL logic scheme applied based on Approved Schematic Diagram. 5. TESTING PROCEDURE 5.1. Current Measurement Check - Input the protection setting (CT ratio, VT ratio, Idiff>, etc.) based on approved calculation note. - Setting PSL (Programmable Scheme Logic) based on approved schematic drawing - Inject secondary current per phase to secondary current terminal at protection panel (Please see Schematic drawing to locate the current terminal position) - Adjust the injected current so the measurement display meets the expected value; Record Data - Calculate the percent error; Record Data `
%Error =
(Iinject x Iprimer) - Iexpected value
X100%
Iexpected value 5.2. Voltage Measurement Check - Input the protection setting (CT ratio, VT ratio, Idiff>, etc.) based on approved calculation note. - Setting PSL (Programmable Scheme Logic) based on approved schematic drawing - Inject secondary voltage per phase to secondary current terminal at protection panel (Please see Schematic drawing to locate the current terminal position) - Adjust the injected voltage so the measurement display meets the expected value; Record Data - Calculate the percent error; Record Data `
(Vinject x Vprimer) - Vexpected value %Error =
x 100% Iexpected value
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID FA - Section
Ref. CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
6
Rev.
A
A T : P/87L
5. TESTING PROCEDURE (Continue…) 5.3. Distance Scheme Check - Permissive underreach scheme option give signal send check applied to zone 1 trip - Record tripping time, signal indication, and relay status - Permissive underreach scheme option signal receive check applied to zone 2 trip - Simulate channel receive - Record tripping time with and without channel receive, relay status, and indication. 5.4. Auto-Reclose Function Check - Setting applied as Single Pole Auto-Relose (SPAR) with Zone 1, 2 , and 3 distance scheme. Please see Approved Calculation Note - Simulate Fault type Distance Zone 1 per phase with Phase-to-Phase and Phase-to-Neutral - Record CB trip status, Auto-reclose status, tripping time, and relay indication - Simulate Fault type Distance Zone 2 per phase with Phase-to-Phase and Phase-to-Neutral - Record CB trip status, Auto-reclose status, tripping time, and relay indication - Simulate Fault type Distance Zone 3 per phase with Phase-to-Phase and Phase-to-Neutral - Record CB trip status, Auto-reclose status, tripping time, and relay indication - Simulate Fault type Distance Zone 2 using channel receive per phase with Phase-to-Phase and Phase-to-Neutral - Record CB trip status, Auto-reclose status, tripping t
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID FA - Section
Ref. CURRENT LINE DIFFERENTIAL RELAY
Chapt.
NARI PCS-902
Sheet :
7
Rev.
A
A T : P/87L
6. FINAL CHECKS The tests are now complete. Remove all test or temporary shorting leads, etc. If it has been necessary to disconnect any of the external wiring from the relay in order to perform the wiring verification tests, it should be ensured that all connections (wiring, fuses and links) are replaced in accordance with the relevant external connection or scheme diagram. Ensure that the relay has been restored to service by checking that cell [0F0D: COMMISSION TESTS, Test Mode] is set to ‘Disabled’. If the relay is in a new installation or the circuit breaker has just been maintained, the circuit breaker maintenance and current counters should be zero. These counters can be reset using cell [0609: CB CONDITION, Reset All Values]. If the required access level is not active, the relay will prompt for a password to be entered so that the setting change can be made. If the menu language has been changed to allow accurate testing it should be restored to the customer’s preferred language. If a P991/MMLG test block is installed, remove the P992/MMLB test plug and replace the cover so that the protection is put into service. Ensure that all event records, fault records, disturbance records, alarms and LEDs have been reset before leaving the relay. If applicable, replace the secondary front cover on the relay.
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.