FACULTAD DE INGENIERÍA INGENIERÍA CIVIL ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO
T3 ( GRUPO 9) DOCENTE: ü ING. JULIO PAIMA ARROYO AUTORES: ü CULQUI ALAYA JUAN (N00021803) ü FLORES MALDONADO MARIA ANGELITA (N00023124) ü MALCA MERLO LUIS ENRIQUE N00027159 ü MILIAN SOTO YERALDI LIZBETH (N00028386) ü RAMIREZ CABRERA ROBERT(N00031407) ü SOLÍS VÁSQUEZ, NANCY ARACELY (N00034707)
CAJAMARCA – PERÚ 2021
PANEL CONTROL SEM SEMANA Prog. Actual Δ
6
1
100.00% 100.00% 0.00%
SPI
100.00%
CURVA DE CONSTRUCCION % 120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00% Sem 1
Sem 2
Sem 3
SEMANA Prog. S/ 141,703.14 Actual S/ 141,703.14 Δ S/ 0
Sem 4
Sem 5
Sem 6
CPI
Sem 7
Sem 8
1.00
CURVA DE COSTOS 160000.00 140000.00 120000.00 100000.00 80000.00 60000.00 40000.00 20000.00 0.00
Sem 9
Sem 10
Sem 11
Sem 12
80000.00 60000.00 40000.00 20000.00 0.00 Sem 1
Sem 2
Sem 3
Sem 4
Sem 5
Sem 6
Sem 7
Sem 8
Sem 9
Sem 10
Sem 11
Sem 12
L CONTROL
m 10
Sem 11
Sem 12
Sem 13
Programado 100.00%
Schedule Actual 100%
Variación 0
Programado S/ 141,703.14
Cost Actual S/ 141,703.14
Variación 0
m 10
Sem 11
Sem 12
Sem 13
ANEXO 02
Presupuesto Ofertado Proyecto
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
Sub Presupuesto
01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
Cliente Ubicación
CAJAMARCA - CAJAMARCA - CAJAMARCA
Item
Descripción
Costo a : Sep. 2021
Unidad
Metrado
Precio
Parcial
Subtotal
E.01 ESTRUCTURAS
69,368.19
01 01.01 01.02 01.03 01.04
OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL
02
DEMOLICIONES
02.01 02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04
DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M.
06 06.01
5,967.47 UND GLB GBL GLB
1.00 1.00 1.00 1.00
1,503.86 3,000.00 642.80 820.81
1,503.86 3,000.00 642.80 820.81
m3
43.85
133.01
5,832.49
M2
29.88
33.25
993.51
m3
59.76
55.24
3,301.14
M3
3.44
338.64
1,164.92
M3 m3 m3
3.44 74.70 46.84
267.69 34.43 43.02
920.85 2,571.92 2,015.06
6,826.00
MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS
9,973.89
OBRAS DE CONCRETO SIMPLE
8,640.39
SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA
1,487.29 m3 M3
4.28 1.84
287.01 140.70
1,228.40 258.89
m3 m2
7.69 61.49
358.62 71.48
2,757.79 4,395.31
SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
7,153.10
OBRAS DE CONCRETO ARMADO
29,960.44
ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2
3,370.10 kg m3
217.00 5.74
5.46 380.71
1,184.82 2,185.28
kg m3 m2
678.17 7.18 43.11
5.46 424.31 92.13
3,702.81 3,046.55 3,971.72
kg m3 m2
1,086.91 3.88 36.32
5.46 488.91 89.06
5,934.53 1,896.97 3,234.66
kg m3 m2
219.96 1.58 25.52
5.46 526.05 108.58
1,200.98 831.16 2,770.96
GLB
1.00
8,000.00
8,000.00
VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
10,721.08
COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
11,066.16
VIGAS ESTRUCTURALES
05.04.01 05.04.02 05.04.03
ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS
4,803.10
ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR-4"X4"x 3mm
8,000.00
A.01 ARQUITECTURA 07 07.01
MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM
08
REVOQUES ENLUCIDOS Y MOLDURAS
08.01 08.02 08.03 08.04 08.05
P.7/84
Total
TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES
37,191.74 11,060.47 m2
106.32
104.03
11,060.47
m2 m2 m2 m2 m
158.80 53.84 36.32 25.52 50.88
29.24 26.11 40.41 59.37 16.31
4,643.31 1,405.76 1,467.69 1,515.12 829.85
9,861.73
ANEXO 02
Presupuesto Ofertado Proyecto
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
Sub Presupuesto
01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
Cliente Ubicación
CAJAMARCA - CAJAMARCA - CAJAMARCA
Item
Descripción
09
Costo a : Sep. 2021
Unidad
Metrado
Precio
Parcial
PISOS Y PAVIMENTOS
09.01 09.02
FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M
1,071.80 m2
29.88
35.87
1,071.80
m2
21.29
30.90
657.86
PISOS
09.02.01 10
657.86
PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS
10.01
878.12
ZOCALO CERAMICO
10.01.01 11
ZOCALO DE CERAMICO 0.30X0.30
878.12 M2
33.97
25.85
878.12
m2
38.60
243.27
9,390.22
M2
38.60
12.78
493.31
m2 m2 m2 m2
158.80 53.84 36.32 25.52
13.21 15.12 13.21 15.15
2,097.75 814.06 479.79 386.63
CARPINTERIA DE MADERA
11.01
VENTANA DE MADERA TORNILLO
12
9,390.22
VIDRIOS CRISTALES Y SIMILARES
12.01
VIDRIO TEMPLADO DE 6mm
13
493.31
PINTURA
13.01 13.02 13.03 13.04
3,778.23
PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS
IE.01 INSTALACIONES ELECTRICAS 14 14.01 14.01.01 14.02 14.02.01
SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4"
3,269.64 3,269.64 2,180.64 pto
24.00
90.86
2,180.64
m
132.00
8.25
1,089.00
1,089.00
OTROS.01 15 15.01
5,376.24 VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA
5,376.24 glb
1.00
5,376.24
5,376.24
5,376.24
COSTO DIRECTO
115,205.81
GASTOS GENERALES UTILIDAD
18.23 % 10.00 %
SUB TOTAL IGV.
ST 18 %
COSTO TOTAL OFERTADO Son : CIENTO SETENTA Y CUATRO MIL TRESCIENTOS DIECISIETE CON 14/100 SOLES
P.8/84
Total
1,729.66
FALSO PISO
09.01.01
Subtotal
21,000.00 11,520.58 147,726.39 26,590.75 174,317.14
Proyecto
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COL
Sub Presupuesto
ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
Cliente Ubicación
CAJAMARCA - CAJAMARCA - CAJAMARCA
ITEM+B6:E80+C10 E.01 01 01.01 01.02 01.03 01.04 02 02.01 02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02
05.04.03 06 06.01 A.01 07 07.01 08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01 09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01 14 14.01 14.01.01 14.02 14.02.01 OTROS.01 15 15.01
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMA
CONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
CAJAMARCA - CAJAMARCA - CAJAMARCA
DESCRIPCIÓN/ ACTIVIDAD ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2
Unidad
Metrado
UND GLB GBL GLB
1.00 1.00 1.00 1.00
m3
43.85
M2
29.88
m3
59.76
M3
3.44
M3 m3 m3
3.44 74.70 46.84
m3 M3
4.28 1.84
m3 m2
7.69 61.49
kg m3
217.00 5.74
kg m3 m2
678.17 7.18 43.11
kg m3 m2
1,086.91 3.88 36.32
kg m3
219.96 1.58
ENCOFRADO Y DESENCOFRADO EN VIGAS ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4"
m2
25.52
GLB
1.00
m2
106.32
m2 m2 m2 m2 m
158.80 53.84 36.32 25.52 50.88
m2
29.88
m2
21.29
M2
33.97
m2
38.60
M2
38.60
m2 m2 m2 m2
158.80 53.84 36.32 25.52
pto
24.00
m
132.00
glb
1.00
VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA
CRISTO REY DE CAJAMARCA
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO RE ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
ITEM E.01 01 01.01 01.02 01.03 01.04 02 02.01 02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 06
06.01 A.01 07 07.01 08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01 09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01 14 14.01 14.01.01 14.02 14.02.01 OTROS.01 15 15.01
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMA
CONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
DESCRIPCIÓN/ ACTIVIDAD ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS ESTRUCTURAS METALICAS
FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR-4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4" VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA
CRISTO REY DE CAJAMARCA
Unidades
Metrado
UND GLB GBL GLB
1.00 1.00 1.00 1.00
m3
43.85
M2
29.88
m3
59.76
M3
3.44
M3 m3 m3
3.44 74.70 46.84
m3 M3
4.28 1.84
m3 m2
7.69 61.49
kg m3
217.00 5.74
kg m3 m2
678.17 7.18 43.11
kg m3 m2
1086.91 3.88 36.32
kg m3 m2
219.96 1.58 25.52
Metrado Actual 1.00 1.00 1.00 1.00 0.00 43.85 29.88 0.00 59.76 3.44 3.44 74.70 46.84 0.00 0.00 4.28 1.84 0.00 7.69 61.49 0.00 0.00 217.00 5.74 0.00 678.17 7.18 43.11 0.00 1086.91 3.88 36.32 0.00 219.96 1.58 25.52 0.00
Sem 1 10/25/2021 10/31/2021
Sem 2 Sem 3 Sem 4 Sem 5 11/1/2021 11/8/2021 11/15/2021 11/22/2021 11/7/2021 11/14/2021 11/21/2021 11/28/2021
1.00 1.00 1.00 1.00
38.37 22.41
5.48 7.47 51.22
8.54
3.44 46.84
1.23
4.28 0.61
144.67 3.83
543.46
GLB
1.00
m2
106.32
m2 m2 m2 m2 m
158.80 53.84 36.32 25.52 50.88
m2
29.88
m2
21.29
M2
33.97
m2
38.60
M2
38.60
m2 m2 m2 m2
158.80 53.84 36.32 25.52
pto
24.00
m
132.00
glb
1.00
1.00 0.00 0.00 106.32 0.00 158.80 53.84 36.32 25.52 50.88 0.00 0.00 29.88 0.00 21.29 0.00 0.00 33.97 0.00 38.60 0.00 38.60 0.00 158.80 53.84 36.32 25.52 0.00 0.00 0.00 24.00 0.00 132.00 0.00 0.00 1.00
0.08
0.08
0.08
0.08
0.08
Sem 6 Sem 7 Sem 8 Sem 9 Sem 10 11/29/2021 12/6/2021 12/13/2021 12/20/2021 12/27/2021 12/5/2021 12/12/2021 12/19/2021 12/26/2021 1/2/2022
3.44 74.70
7.69 61.49
72.33 1.91 678.17 4.79 43.11
2.39
543.46 18.16
3.88 18.16 219.96 1.58 25.52
Sem 11 1/3/2022 1/9/2022
Sem 12 1/10/2022 1/16/2022
Sem 13 1/17/2022 1/23/2022
0.13
0.30
0.30
0.26
93.03
13.29 158.80 53.84 36.32 8.51 16.96
17.01 33.92
29.88 21.29
33.97 19.30
19.30 38.60 158.80 53.84 36.32 25.52
24.00 132.00
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.07
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS CAJAMARCA - CAJAMARCA - CAJAMARCA
ITEM E.01 01 01.01 01.02 01.03 01.04 02 02.01
02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01
05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 06 06.01 A.01 07 07.01 08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01
09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01 14 14.01 14.01.01 14.02 14.02.01 OTROS.01 15 15.01
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
1 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
AJAMARCA - CAJAMARCA - CAJAMARCA
DESCRIPCIÓN/ ACTIVIDAD ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS
ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR-4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M
PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4" VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA
AMARCA X
Unidades
UND GLB GBL GLB
m3
Metrado
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 43.85 43.85
M2
m3 M3 M3 m3 m3
m3 M3
m3 m2
29.88 29.88 59.76 59.76 3.44 3.44 3.44 3.44 74.70 74.70 46.84 46.84
4.28 4.28 1.84 1.84 7.69 7.69 61.49 61.49
Metrado Acum A:
Escenario
1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 -
Prog. Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog.
43.85
Prog.
43.85 29.88 29.88 59.76 59.76
Actual Prog. Actual Prog. Prog. Actual
3.44 3.44 3.44 3.44 74.70 74.70 46.84 46.84 4.28 4.28 1.84 1.84 7.69 7.69 61.49 61.49 -
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Prog. Actual Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Prog.
Duración (Dias Habiles)
Hitos programados Inicio
Fin
Sem 1 10/25/2021 10/31/2021
7 1
10/25/2021 10/25/2021
10/31/2021 10/25/2021
1
10/25/2021
10/25/2021
3
10/26/2021
10/28/2021
3
10/29/2021
10/31/2021
8
11/1/2021
11/8/2021
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -
8
11/1/2021
11/8/2021
-
4
11/5/2021
11/8/2021
27 7
11/9/2021 11/9/2021
12/5/2021 11/15/2021
4
11/30/2021
12/3/2021
4
11/16/2021
11/19/2021
2
12/4/2021
12/5/2021
3
11/9/2021
11/11/2021
23 7 4
11/20/2021 11/20/2021 11/23/2021
12/12/2021 11/26/2021 11/26/2021
3
11/20/2021
11/22/2021
6 2
12/7/2021 12/11/2021
12/12/2021 12/12/2021
4
12/7/2021
12/10/2021
30 3
11/27/2021 11/27/2021
12/26/2021 11/29/2021
-
kg m3
kg m3 m2
kg m3 m2
kg m3 m2
GLB
m2
m2 m2 m2 m2 m
m2
217.00 217.00 5.74 5.74 678.17 678.17 7.18 7.18 43.11 43.11 1,086.91 1,086.91 3.88 3.88 36.32 36.32 219.96 219.96 1.58 1.58 25.52 25.52 1.00 1.00
106.32 106.32 158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52 50.88 50.88
29.88 29.88
217.00 217.00 5.74 5.74 678.17 678.17 7.18 7.18 43.11 43.11 1,086.91 1,086.91 3.88 3.88 36.32 36.32 219.96 219.96 1.58 1.58 25.52 25.52 1.00 1.00 106.32 106.32 158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52 50.88 50.88 29.88 29.88
Prog. Actual Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Actual Prog. Prog. Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Prog. Actual
3
11/27/2021
11/29/2021
3
11/27/2021
11/29/2021
7 4
11/30/2021 11/30/2021
12/6/2021 12/3/2021
3
12/4/2021
12/6/2021
4
11/30/2021
12/3/2021
23 4
11/27/2021 11/27/2021
12/19/2021 11/30/2021
4
12/16/2021
12/19/2021
4
12/11/2021
12/14/2021
7 4
12/20/2021 12/20/2021
12/26/2021 12/23/2021
3
12/24/2021
12/26/2021
4
12/20/2021
12/23/2021
23 23
12/3/2021 12/3/2021
12/25/2021 12/25/2021
8 8
12/13/2021 12/13/2021
12/20/2021 12/20/2021
8 5
12/21/2021 12/21/2021
12/28/2021 12/25/2021
4
12/23/2021
12/26/2021
3
12/24/2021
12/26/2021
3
12/26/2021
12/28/2021
3
12/26/2021
12/28/2021
11 3 3
12/30/2021 12/30/2021 12/30/2021
1/9/2022 1/1/2022 1/1/2022
-
m2
21.29 21.29
M2
33.97 33.97
m2
38.60 38.60
M2
38.60 38.60
m2 m2 m2 m2
pto
158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52
24.00 24.00
m
glb
132.00 132.00
1.00 1.00
21.29 21.29 33.97 33.97 38.60 38.60 38.60 38.60 158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52 -
Prog. Prog. Actual Prog. Prog. Prog. Actual Prog. Prog. Actual Prog. Prog. Actual Prog. Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Prog. Prog.
24.00
Prog.
24.00 132.00 132.00 -
Actual Prog. Prog. Actual Prog. Prog.
1.00 1.00
Prog. Actual
6 6
1/4/2022 1/4/2022
1/9/2022 1/9/2022
3 3 3
1/6/2022 1/6/2022 1/6/2022
1/8/2022 1/8/2022 1/8/2022
12 12
1/4/2022 1/4/2022
1/15/2022 1/15/2022
5 5
1/18/2022 1/18/2022
1/22/2022 1/22/2022
5 1
1/16/2022 1/16/2022
1/20/2022 1/16/2022
1
1/17/2022
1/17/2022
1
1/18/2022
1/18/2022
1
1/20/2022
1/20/2022
13 13
12/30/2021 12/30/2021
1/11/2022 1/11/2022
-
2
12/30/2021
12/31/2021
-
2 2
12/30/2021 12/30/2021
12/31/2021 12/31/2021
90
10/25/2021
1/22/2022
90
10/25/2021
1/22/2022
Inicio 10/25/2021 Duración
Fin 1/22/2022 89
0.08 0.08
X
X
X
X
X
X
X
X
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 Sem 8 Sem 9 11/1/2021 11/8/2021 11/15/2021 11/22/2021 11/29/2021 12/6/2021 12/13/2021 12/20/2021 11/7/2021 11/14/2021 11/21/2021 11/28/2021 12/5/2021 12/12/2021 12/19/2021 12/26/2021
1.00 -
-
-
-
-
-
-
-
38.37
5.48
-
-
-
-
-
-
38.37 22.41 22.41 -
5.48 7.47 7.47 51.22 51.22
8.54 8.54
-
-
-
-
-
46.84 46.84 -
3.44 3.44 1.23 1.23 -
4.28 4.28 0.61 0.61 -
-
-
-
3.44 3.44 74.70 74.70 -
7.69 7.69 61.49 61.49 -
-
-
-
144.67 144.67 3.83 3.83 543.46 543.46 -
72.33 72.33 1.91 1.91 678.17 678.17 4.79 4.79 43.11 43.11 543.46 543.46 0.13 0.13 -
2.39 2.39 18.16 18.16 0.30 0.30 -
3.88 3.88 18.16 18.16 0.30 0.30 93.03 93.03 -
219.96 219.96 1.58 1.58 25.52 25.52 0.26 0.26 13.29 13.29 158.80 158.80 53.84 53.84 36.32 36.32 8.51 8.51 16.96 16.96 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.08 0.08
0.08 0.08
0.08 0.08
0.08 0.08
0.08 0.08
0.08 0.08
0.08 0.08
0.08 0.08
X
X
Sem 10 12/27/2021 1/2/2022
X
Sem 11 1/3/2022 1/9/2022
X
Sem 12 1/10/2022 1/16/2022
Sem 13 1/17/2022 1/23/2022
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
17.01 17.01 33.92 33.92 29.88 29.88
-
-
-
-
21.29 21.29 33.97 33.97 19.30 19.30 -
19.30 19.30 158.80 158.80 -
38.60 38.60 53.84 53.84 36.32 36.32 25.52 25.52 -
24.00
-
-
-
24.00 132.00 132.00 -
-
-
-
0.08 0.08
0.08 0.08
0.07 0.07
0.08 0.08
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO RE ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
ITEM
DESCRIPCIÓN/ ACTIVIDAD
E.01 01 01.01 01.02 01.03 01.04 02
ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES
02.01
DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE
02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03
DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS
Unidad
UND GLB GBL GLB
m3 M2 m3 M3 M3 m3 m3
m3 M3 m3 m2
kg m3 kg m3 m2 kg m3 m2 kg m3 m2
06 06.01 A.01 07 07.01 08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01 09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01 14 14.01 14.01.01 14.02 14.02.01 OTROS.01 15 15.01
ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4" VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA COSTO DIRECTO GASTOS GENERALES UTILIDAD PRESUPUESTO TOTAL
GLB
m2 m2 m2 m2 m2 m
m2 m2
M2 m2 M2 m2 m2 m2 m2
pto m
glb
EL COLEGIO CRISTO REY DE CAJAMARCA
Metrado
PRESUPUESTO PU (S/)
TOTAL
ANTERIOR METRADO
ACTUAL
TOTAL
METRADO
ACUMULADO
TOTAL
1.00 1.00 1.00 1.00
1,503.86 3,000.00 642.80 820.81
1,503.86 3,000.00 642.80 820.81 -
-
-
-
-
43.85
133.01
5,832.49
-
-
-
-
29.88
33.25
993.51
-
-
-
-
59.76
55.24
3,301.14
-
-
-
-
3.44
338.64
1,164.92
-
-
-
-
3.44 74.70 46.84
267.69 34.43 43.02
4.28 1.84
287.01 140.70
7.69 61.49
358.62 71.48
217.00 5.74
5.46 380.71
678.17 7.18 43.11
5.46 424.31 92.13
1,086.91 3.88 36.32
5.46 488.91 89.06
219.96 1.58 25.52
5.46 526.05 108.58
920.85 2,571.92 2,015.06 1,228.40 258.89 2,757.79 4,395.31 1,184.82 2,185.28 3,702.81 3,046.55 3,971.72 5,934.53 1,896.97 3,234.66 1,200.98 831.16 2,770.96
-
-
-
-
METRADO
-
1.00
8,000.00
106.32
104.03
158.80 53.84 36.32 25.52 50.88
29.24 26.11 40.41 59.37 16.31
29.88
35.87
21.29
30.90
33.97
25.85
38.60
243.27
38.60
12.78
158.80 53.84 36.32 25.52
13.21 15.12 13.21 15.15
24.00
90.86
132.00
8.25
1.00
5,376.24 15% 8%
-
-
-
-
8,000.00
-
-
-
-
11,060.47 4,643.31 1,405.76 1,467.69 1,515.12 829.85 1,071.80 657.86 878.12 9,390.22 493.31 2,097.75 814.06 479.79 386.63 -
-
-
-
-
2,180.64
-
-
-
-
1,089.00 -
-
-
-
-
5,376.24
-
-
-
-
115,205.81 17,280.87 9,216.46 141,703.14
-
-
-
METRADO
ACUMULADO
SALDO
TOTAL
METRADO
TOTAL
Sem 1
Sem 2
Sem 3
Sem 4
10/1/2021
10/8/2021
10/15/2021
10/22/2021
10/7/2021
10/14/2021
10/21/2021
10/28/2021
-
-1.00 -1.00 -1.00 -1.00 -
-
1,503.86 3,000.00 642.80 820.81 -
1.00 1.00 1.00 1.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
-
-43.85 -
5,832.49
0.00
38.37
5.48
0.00
-
-29.88 -59.76 -
993.51 3,301.14
0.00 0.00 0.00
22.41 0.00 0.00
7.47 0.00 51.22
0.00 0.00 8.54
1,164.92 920.85 2,571.92 2,015.06 1,228.40 258.89 2,757.79 4,395.31 1,184.82 2,185.28 3,702.81 3,046.55 3,971.72 5,934.53 1,896.97 3,234.66 1,200.98 831.16 2,770.96
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 46.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 3.44 0.00 0.00 0.00 0.00 0.00 1.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-
-3.44 -3.44 -74.70 -46.84 -4.28 -1.84 -7.69 -61.49 -217.00 -5.74 -678.17 -7.18 -43.11 -1,086.91 -3.88 -36.32 -219.96 -1.58 -25.52
-
-
-
-
-
0.00
0.00
0.00
0.00
8,000.00 11,060.47 4,643.31 1,405.76 1,467.69 1,515.12 829.85 1,071.80 657.86 878.12 9,390.22 493.31 2,097.75 814.06 479.79 386.63 -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-
-
-1.00 -106.32 -158.80 -53.84 -36.32 -25.52 -50.88 -29.88 -21.29 -33.97 -38.60 -38.60 -158.80 -53.84 -36.32 -25.52 -
-
-24.00 -132.00 -
2,180.64 1,089.00 -
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
-1.00 -
5,376.24 115,205.81
0.08
0.08
0.08
0.08
- -
-
-
-
-
METRADOS ACTUALES SEMANALES REPORTADOS
Sem 5
Sem 6
Sem 7
Sem 8
Sem 9
Sem 10
Sem 11
Sem 12
10/29/2021
11/5/2021
11/12/2021
11/19/2021
11/26/2021
12/3/2021
12/10/2021
12/17/2021
11/4/2021
11/11/2021
11/18/2021
11/25/2021
12/2/2021
12/9/2021
12/16/2021
12/23/2021
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 4.28 0.61 0.00 0.00 0.00 0.00 0.00 144.67 3.83 0.00 0.00 0.00 0.00 0.00 543.46 0.00 0.00 0.00 0.00 0.00 0.00
3.44 0.00 74.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.33 1.91 0.00 678.17 4.79 43.11 0.00 543.46 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.69 61.49 0.00 0.00 0.00 0.00 0.00 0.00 2.39 0.00 0.00 0.00 0.00 18.16 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.88 18.16 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 219.96 1.58 25.52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 0.00 0.00 93.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.26 0.00 0.00 13.29 0.00 158.80 53.84 36.32 8.51 16.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.01 33.92 0.00 0.00 29.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.29 0.00 0.00 33.97 0.00 19.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.30 0.00 0.00 0.00 158.80 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
24.00 0.00 132.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
COSTOS ACTUALES SEMANALES R
Sem 13
Sem 1
Sem 2
12/24/2021
10/1/2021
10/8/2021
10/15/2021
10/22/2021
10/29/2021
11/5/2021
12/30/2021
10/7/2021
10/14/2021
10/21/2021
10/28/2021
11/4/2021
11/11/2021
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sem 3
Sem 4
Sem 5
Sem 6
1503.86
0
0
0
0
0
3000
0
0
0
0
0
642.8
0
0
0
0
0
820.81
0
0
0
0
0
0
0
0
0
0
0
0
5103.43
729.06
0
0
0
0
745.13
248.38
0
0
0
0
0
0
0
0
0
0
0
2829.55
471.59
0
0
0
0
0
0
0
1164.92
0
0
0
920.85
0
0
0
0
0
0
0
2571.92
0
0
2015.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1228.4
0
0
0
0
172.59
86.3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
789.88
394.94
0
0
0
0
1456.85
728.43
0
0
0
0
0
0
0
0
0
0
0
3702.81
0
0
0
0
0
2031.03
0
0
0
0
0
3971.72
0
0
0
0
0
0
0
0
0
0
2967.26
2967.26
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.60 0.00 0.00 53.84 36.32 25.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07
0
0
0
0
0
0
0
0
0
0
0
1043.48
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
418.15
418.15
418.15
418.15
418.15
418.15
6385.62
6266.71
6240.20
1983.18
6946.84
18994.66
957.84
940.01
936.03
297.48
1042.03
2849.20
510.85
501.34
499.22
158.65
555.75
1519.57
7854.32
7708.06
7675.45
2439.31
8544.62
23363.43
S ACTUALES SEMANALES REPORTADOS
Sem 7
Sem 8
Sem 9
Sem 10
Sem 11
Sem 12
Sem 13
11/12/2021
11/19/2021
11/26/2021
12/3/2021
12/10/2021
12/17/2021
12/24/2021
11/18/2021
11/25/2021
12/2/2021
12/9/2021
12/16/2021
12/23/2021
12/30/2021
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2757.79
0
0
0
0
0
0
4395.31
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1015.52
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1896.97
0
0
0
0
0
1617.33
1617.33
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200.98
0
0
0
0
0
0
831.16
0
0
0
0
0
0
2770.96
0
0
0
0
0
0
0
0
0
0
0
2434.78
2434.78
2086.96
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9677.91
1382.56
0
0
0
0
0
0
0
0
0
0
0
0
0
4643.31
0
0
0
0
0
0
1405.76
0
0
0
0
0
0
1467.69
0
0
0
0
0
0
505.04
1010.08
0
0
0
0
0
276.62
553.24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1071.8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
657.86
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
878.12
0
0
0
0
0
0
0
0
0
0
0
0
0
4695.11
4695.11
0
0
0
0
0
0
0
0
0
0
0
0
0
0
493.31
0
0
0
0
0
0
0
0
0
0
0
0
2097.75
0
0
0
0
0
0
0
814.06
0
0
0
0
0
0
479.79
0
0
0
0
0
0
386.63
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2180.64
0
0
0
0
0
0
0
0
0
0
0
0
0
1089
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
418.15
418.15
418.15
418.15
418.15
418.15
358.42
12638.88
16045.14
16989.19
6322.91
6649.24
7211.01
2532.21
1895.83
2406.77
2548.38
948.44
997.39
1081.65
379.83
1011.11
1283.61
1359.14
505.83
531.94
576.88
202.58
15545.82
19735.52
20896.71
7777.18
8178.57
8869.54
3114.61
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRIS 01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ITEM
E.01 01 01.01 01.02 01.03 01.04 02
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
02.01
02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89
04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 06 06.01 A.01 07 07.01
90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136
08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01 09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01
IE.01
137 138 14 139 140 14.01 141 142
14.01.01
143 144 14.02 145 146 14.02.01 147 148 OTROS.01 149 150 15 151 152 153 154 155 156 157 158 159
15.01
AVANCE DEL PROYECTO COSTO DEL PROYECTO COSTO DIRECTO GASTOS GENERALES UTILIDAD PRESUPUESTO TOTAL
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMA
1 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
DESCRIPCIÓN/ ACTIVIDAD ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS
SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR-4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM
REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4"
VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA
AVANCE DEL PROYECTO COSTO DEL PROYECTO COSTO DIRECTO GASTOS GENERALES UTILIDAD PRESUPUESTO TOTAL
CRISTO REY DE CAJAMARCA
Unidades
UND GLB GBL GLB
Peso 60.21% 60.21% 5.18% 5.18% 1.31% 1.31% 2.60% 2.60% 0.56% 0.56% 0.71% 0.71%
Metrado
Metrado Acum A: 13
Duración (Dias Habiles)
Inicio
Prog.
7
10/25/2021
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog.
1
10/25/2021
1
10/25/2021
3
10/26/2021
3
10/29/2021
8
11/1/2021
8
11/1/2021
4
11/5/2021
27
11/9/2021
100.00% Prog. 100.00% Actual
7
11/9/2021
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
4
11/30/2021
4
11/16/2021
2
12/4/2021
Escenario
Hitos programados
Prog.
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
5.93% 5.93% m3
M2
m3 M3 M3 m3 m3
m3 M3
5.06%
43.85
5.06%
43.85
0.86% 0.86% 8.66% 8.66% 2.87% 2.87%
29.88 29.88
1.01%
3.44
1.01% 0.80% 0.80% 2.23% 2.23% 1.75% 1.75% 7.50% 7.50% 1.29% 1.29% 1.07% 1.07% 0.22% 0.22% 6.21%
3.44 3.44 3.44 74.70 74.70 46.84 46.84
59.76 59.76
4.28 4.28 1.84 1.84
100.00% Prog. 100.00% Actual 100.00% Prog. 100.00% Actual Prog.
100.00% 100.00% 100.00% 100.00%
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog.
3
11/9/2021
23
11/20/2021
Prog.
7
11/20/2021
Prog. Actual Prog. Actual Prog.
4
11/23/2021
3
11/20/2021
6
12/7/2021
m3 m2
kg m3
kg m3 m2
kg m3 m2
kg m3 m2
GLB
m2
6.21% 2.39% 2.39% 3.82% 3.82% 26.01% 26.01% 2.93% 2.93% 1.03% 1.03% 1.90% 1.90% 9.31% 9.31% 3.21% 3.21% 2.64% 2.64% 3.45% 3.45% 9.61% 9.61% 5.15% 5.15% 1.65% 1.65% 2.81% 2.81% 4.17% 4.17% 1.04% 1.04% 0.72% 0.72% 2.41% 2.41% 6.94% 6.94% 6.94% 6.94% 32.28% 32.28% 9.60% 9.60% 9.60% 9.60%
7.69 7.69 61.49 61.49
217.00 217.00 5.74 5.74
678.17 678.17 7.18 7.18 43.11 43.11
1,086.91 1,086.91 3.88 3.88 36.32 36.32
219.96 219.96 1.58 1.58 25.52 25.52
1.00 1.00
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Prog. Actual Prog. Actual Prog.
2
12/11/2021
4
12/7/2021
30
11/27/2021
Prog.
3
11/27/2021
Prog. Actual Prog. Actual Prog.
3
11/27/2021
3
11/27/2021
7
11/30/2021
Prog. Actual Prog. Actual Prog. Actual Prog.
4
11/30/2021
3
12/4/2021
4
11/30/2021
23
11/27/2021
Prog. Actual Prog. Actual Prog. Actual Prog.
4
11/27/2021
4
12/16/2021
4
12/11/2021
7
12/20/2021
Prog. Actual Prog. Actual Prog. Actual Prog.
4
12/20/2021
3
12/24/2021
4
12/20/2021
23
12/3/2021
23
12/3/2021
8
12/13/2021
8
12/13/2021
100.00% Prog. 100.00% Actual Prog. Prog.
106.32 106.32
100.00% Prog. 100.00% Actual
m2 m2 m2 m2 m
m2
m2
M2
m2
M2
m2 m2 m2 m2
8.56% 8.56% 4.03% 4.03% 1.22% 1.22% 1.27% 1.27% 1.32% 1.32% 0.72% 0.72% 1.50% 1.50% 0.93% 0.93% 0.93% 0.93% 0.57% 0.57% 0.57% 0.57% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76% 8.15% 8.15% 8.15% 8.15% 0.43% 0.43% 0.43% 0.43% 3.28% 3.28% 1.82% 1.82% 0.71% 0.71% 0.42% 0.42% 0.34% 0.34% 2.84%
158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52 50.88 50.88
29.88 29.88
21.29 21.29
Prog.
8
12/21/2021
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog.
5
12/21/2021
4
12/23/2021
3
12/24/2021
3
12/26/2021
3
12/26/2021
11
12/30/2021
Prog.
3
12/30/2021
100.00% Prog. 100.00% Actual Prog.
3
12/30/2021
6
1/4/2022
100.00% Prog. 100.00% Actual Prog.
6
1/4/2022
3
1/6/2022
3
1/6/2022
3
1/6/2022
12
1/4/2022
100.00% Prog. 100.00% Actual Prog.
12
1/4/2022
5
1/18/2022
100.00% Prog. 100.00% Actual Prog.
5
1/18/2022
5
1/16/2022
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
1
1/16/2022
1
1/17/2022
1
1/18/2022
1
1/20/2022
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Prog. 33.97 33.97
38.60 38.60
38.60 38.60
158.80 158.80 53.84 53.84 36.32 36.32 25.52 25.52
100.00% Prog. 100.00% Actual Prog.
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog.
2.84% 2.84% 2.84% 1.89% 1.89% pto
m
glb
1.89%
24.00
1.89%
24.00
0.95% 0.95% 0.95% 0.95% 4.67% 4.67% 4.67% 4.67%
132.00 132.00
4.67%
1.00
4.67%
1.00
Prog.
13
12/30/2021
Prog.
13
12/30/2021
100.00% Prog.
2
12/30/2021
100.00% Actual Prog.
2
12/30/2021
2
12/30/2021
Prog.
90
10/25/2021
100.00% Prog. 100.00% Actual
90
10/25/2021
100.00% Prog. 100.00% Actual Prog.
100.00% 100.00% Prog. 100.00% Actual 141,703.14 141,703.14
Prog. Actual
15% 8%
115,205.81 17,280.87 9,216.46 141,703.14
Hitos programados Fin
10/31/2021 10/25/2021 10/25/2021 10/28/2021 10/31/2021 11/8/2021
Sem 1 10/25/2021 10/31/2021 5.18% 5.18% 5.18% 5.18%
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 11/1/2021 11/8/2021 11/15/2021 11/22/2021 11/29/2021 12/6/2021 11/7/2021 11/14/2021 11/21/2021 11/28/2021 12/5/2021 12/12/2021 10.26% 10.26% 5.18% 5.18%
15.31% 15.31% 5.18% 5.18%
16.67% 16.67% 5.18% 5.18%
22.34% 22.34% 5.18% 5.18%
38.46% 38.46% 5.18% 5.18%
49.07% 49.07% 5.18% 5.18%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00%
5.08% 5.08%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
11/8/2021
0.00%
87.50%
100.00%
100.00%
100.00%
100.00%
100.00%
11/8/2021
0.00% 0.00% 0.00%
87.50% 75.00% 75.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
4.21% 4.21%
5.41% 5.41%
5.41% 5.41%
8.66% 8.66%
8.66% 8.66%
12/5/2021
0.00% 0.00%
0.00% 0.00%
11/15/2021
0.00% 0.00%
0.00% 0.00%
85.71% 85.71%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
12/3/2021
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00%
0.00% 0.00% 100.00% 100.00% 0.00% 0.00% 100.00% 100.00%
0.00% 0.00% 100.00% 100.00% 0.00% 0.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
0.15% 0.15% 0.15% 0.15%
1.29% 1.29% 1.29% 1.29%
1.29% 1.29% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00%
0.00%
6.21%
11/19/2021 12/5/2021 11/11/2021 12/12/2021 11/26/2021 11/26/2021 11/22/2021 12/12/2021
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 66.67% 66.67% 0.00%
0.00%
12/12/2021 12/10/2021 12/26/2021 11/29/2021 11/29/2021 11/29/2021 12/6/2021 12/3/2021 12/6/2021 12/3/2021 12/19/2021 11/30/2021 12/19/2021 12/14/2021 12/26/2021 12/23/2021 12/26/2021 12/23/2021 12/25/2021 12/25/2021
12/20/2021 12/20/2021
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00% 4.53% 4.53% 1.95% 1.95%
66.67% 66.67% 66.67% 66.67% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.58% 2.58%
50.00% 50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00% 16.50% 16.50% 2.93% 2.93%
6.21%
100.00% 100.00% 100.00% 100.00% 18.79% 18.79% 2.93% 2.93%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
8.42% 8.42%
9.31% 9.31%
100.00% 100.00% 66.67% 66.67% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
5.15% 5.15%
6.56% 6.56%
100.00% 100.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 0.00% 0.00% 50.00% 50.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91%
13.04% 13.04% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 3.02% 3.02%
43.48% 43.48% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
12/28/2021 12/25/2021 12/26/2021 12/26/2021 12/28/2021 12/28/2021 1/9/2022 1/1/2022 1/1/2022 1/9/2022 1/9/2022 1/8/2022 1/8/2022 1/8/2022 1/15/2022 1/15/2022 1/22/2022 1/22/2022 1/20/2022 1/16/2022 1/17/2022 1/18/2022 1/20/2022
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1/11/2022 1/11/2022
12/31/2021
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
12/31/2021 12/31/2021
1/22/2022
1/22/2022
0.00% 0.00%
0.00% 0.00% 0.36% 0.36% 0.36% 0.36%
7.78% 7.78% 5.54% 5.54%
115,205.81 17,280.87 9,216.46 141,703.14
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.73% 0.73% 0.73% 0.73%
15.56% 15.56%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 1.09% 1.09% 1.09% 1.09%
23.33% 23.33%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 1.45% 1.45% 1.45% 1.45%
31.11% 31.11%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 1.81% 1.81% 1.81% 1.81%
38.89% 38.89%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 2.18% 2.18% 2.18% 2.18%
46.67% 46.67%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 2.54% 2.54% 2.54% 2.54%
54.44% 54.44%
10.98% 10.98%
16.40% 16.40%
18.12% 18.12%
24.15% 24.15%
40.64% 40.64%
51.61% 51.61%
7854.32 7854.32
15562.37 15562.37
23237.81 23237.82
25677.14 25677.12
34221.76 34221.74
57585.20 57585.17
73131.01 73131.00
6385.62
6,266.71
6,240.20
1,983.19
6,946.85
18,994.67
12,638.87
957.84
940.01
936.03
297.48
1042.03
2849.20
1895.83
510.85
501.34
499.22
158.66
555.75
1519.57
1011.11
7854.32
7708.06
7675.44
2439.32
8544.62
23363.44
15545.81
Sem 8 Sem 9 Sem 10 12/13/2021 12/20/2021 12/27/2021 12/19/2021 12/26/2021 1/2/2022 54.23% 54.23% 5.18% 5.18%
60.21% 60.21% 5.18% 5.18%
60.21% 60.21% 5.18% 5.18%
Sem 11 1/3/2022 1/9/2022 60.21% 60.21% 5.18% 5.18%
Sem 12 1/10/2022 1/16/2022 60.21% 60.21% 5.18% 5.18%
Sem 13 1/17/2022 1/23/2022 60.21% 60.21% 5.18% 5.18%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
5.93% 5.93%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
8.66% 8.66%
8.66% 8.66%
8.66% 8.66%
8.66% 8.66%
8.66% 8.66%
8.66% 8.66%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
7.50% 7.50% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
7.50% 7.50% 1.29% 1.29%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
6.21%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
21.84% 21.84% 2.93% 2.93%
26.01% 26.01% 2.93% 2.93%
26.01% 26.01% 2.93% 2.93%
26.01% 26.01% 2.93% 2.93%
26.01% 26.01% 2.93% 2.93%
26.01% 26.01% 2.93% 2.93%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
9.31% 9.31%
9.31% 9.31%
9.31% 9.31%
9.31% 9.31%
9.31% 9.31%
9.31% 9.31%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
9.61% 9.61%
9.61% 9.61%
9.61% 9.61%
9.61% 9.61%
9.61% 9.61%
9.61% 9.61%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00%
4.17% 4.17%
4.17% 4.17%
4.17% 4.17%
4.17% 4.17%
4.17% 4.17%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
6.94% 6.94%
6.94% 6.94%
6.94% 6.94%
6.94% 6.94%
6.94% 6.94%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.13% 5.13%
73.91% 73.91% 8.40% 8.40% 8.40% 8.40%
87.50% 87.50%
16.80% 16.80% 9.60% 9.60%
100.00% 100.00%
19.09% 19.09% 9.60% 9.60%
100.00% 100.00%
24.50% 24.50% 9.60% 9.60%
100.00% 100.00%
30.40% 30.40% 9.60% 9.60%
100.00% 100.00%
32.28% 32.28% 9.60% 9.60%
100.00% 100.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7.20% 7.20%
8.56% 8.56%
8.56% 8.56%
8.56% 8.56%
8.56% 8.56%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 33.33% 33.33% 33.33% 33.33%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
0.93% 0.93% 0.93% 0.93%
1.50% 1.50% 0.93% 0.93%
1.50% 1.50% 0.93% 0.93%
1.50% 1.50% 0.93% 0.93%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
0.57% 0.57%
0.57% 0.57%
0.57% 0.57%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.76% 0.76% 0.76% 0.76%
0.76% 0.76% 0.76% 0.76%
0.76% 0.76% 0.76% 0.76%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
4.08% 4.08%
8.15% 8.15%
8.15% 8.15%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
0.43% 0.43%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.84%
50.00% 50.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.84%
0.00% 0.00%
100.00% 100.00%
1.82% 1.82%
3.28% 3.28%
100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
2.84%
2.84%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 2.90% 2.90% 2.90% 2.90%
62.22% 62.22% 65.54% 65.54%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 3.27% 3.27% 3.27% 3.27%
70.00% 70.00% 80.28% 80.28%
2.84% 2.84% 2.84% 1.89% 1.89%
2.84% 2.84% 2.84% 1.89% 1.89%
2.84% 2.84% 2.84% 1.89% 1.89%
2.84% 2.84% 2.84% 1.89% 1.89%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.95% 0.95%
0.95% 0.95%
0.95% 0.95%
0.95% 0.95%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
3.63% 3.63% 3.63% 3.63%
3.99% 3.99% 3.99% 3.99%
4.36% 4.36% 4.36% 4.36%
4.67% 4.67% 4.67% 4.67%
77.78% 77.78% 85.77% 85.77%
85.56% 85.56% 91.54% 91.54%
93.33% 93.33% 97.80% 97.80%
100.00% 100.00% 100.00% 100.00%
92866.54 92866.52
113763.25 113763.23
121540.42 121540.41
129718.99 129718.98
138588.54 138588.52
141703.14 141703.14
16,045.15
16,989.19
6,322.90
6,649.25
7,211.01
2,532.20
2406.77
2548.38
948.44
997.39
1081.65
379.83
1283.61
1359.14
505.83
531.94
576.88
202.58
19735.53
20896.71
7777.17
8178.58
8869.54
3114.61
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO RE ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
ITEM
DESCRIPCIÓN/ ACTIVIDAD
E.01 01 01.01 01.02 01.03 01.04 02
ESTRUCTURAS OBRAS PRELIMINARES CARTEL DE OBRA ALMACEN, SUMINISTROS ENTRE OTROS TRAZO Y REPLANTEO APUNTALAMIENTO TEMPORAL DEMOLICIONES
02.01
DEMOLICION DE MUROS DE ALBAÑILERIA, COLUMNAS, SOBRECIMIENTOS Y CIMIENTOS CORRIDOS DEL PABELLÓN EXISTENTE
02.02 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03
DEMOLICION DE PISOS DE CONCRETO SIMPLE EN EL PRIMER NIVEL ESPESOR 0.10 M. MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA ZAPATAS RELLENO CONTROLADO CON MATERIAL AFIRMADO COMPACTADO AL 95% DEL PROCTOR MODIFICADO MEJORAMIENTO DE SUELO CON PIEDRA MEDIANA DE 6" ELIMINACION MATERIAL EXCEDENTE ELIMINACION DE ESCOMBROS OBRAS DE CONCRETO SIMPLE SUBZAPATA Y CIMIENTO CORRIDO DE CONCRETO CICLOPEO CONCRETO f'c=100 Kg/cm2 EN SUBZAPATA PIEDRA MEDIANA DE 6" EN SUBZAPATA SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS OBRAS DE CONCRETO ARMADO ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION COLUMNAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN COLUMNAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS VIGAS ESTRUCTURALES ACERO DE REFUERZO Fy=4200 kg/cm2 CONCRETO EN VIGAS f´c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO EN VIGAS
Unidad
UND GLB GBL GLB
m3 M2 m3 M3 M3 m3 m3
m3 M3 m3 m2
kg m3 kg m3 m2 kg m3 m2 kg m3 m2
06 06.01 A.01 07 07.01 08 08.01 08.02 08.03 08.04 08.05 09 09.01 09.01.01 09.02 09.02.01 10 10.01 10.01.01 11 11.01 12 12.01 13 13.01 13.02 13.03 13.04 IE.01 14 14.01 14.01.01 14.02 14.02.01 OTROS.01 15 15.01
ESTRUCTURAS METALICAS FABRICACIÓN, SUMINISTRO Y MONTAJE DE ARRIOSTRE METÁLICO TR4"X4"x 3mm ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK CABEZA M:1:1:4 E=1.5 CM REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE MUROS INTERIORES, MEZCLA C:A 1:5 TARRAJEO DE MUROS EXTERIORES, MEZCLA C:A 1:5 TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS VESTIDURA DE DERRAMES PISOS Y PAVIMENTOS FALSO PISO FALSO PISO DE CONCRETO SIMPLE F'C=140 KG/CM2, E=0.10M PISOS PISO CERAMICA 0.30 x 0.30 (SOLO COLOCACIÓN) ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO ZOCALO DE CERAMICO 0.30X0.30 CARPINTERIA DE MADERA VENTANA DE MADERA TORNILLO VIDRIOS CRISTALES Y SIMILARES VIDRIO TEMPLADO DE 6mm PINTURA PINTURA EN MUROS INTERIORES PINTURA EN MUROS EXTERIORES PINTURA EN COLUMNAS PINTURA EN VIGAS INSTALACIONES ELECTRICAS SISTEMA DE TOMACORRIENTES SALIDA PARA TOMACORRIENTES SALIDA PARED PARA TOMACORRIENTE DOBLE, TUBERIA PVC SEL PESADO 3/4", CABLE LSOHX-90 4mm2, CAJA PESADA DUCTOS Y TUBERIAS ALUMBRADO TUBERIA PVC SEL PESADO DIAM. 3/4" VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN OBRA COSTO DIRECTO GASTOS GENERALES UTILIDAD PRESUPUESTO TOTAL
GLB
m2 m2 m2 m2 m2 m
m2 m2
M2 m2 M2 m2 m2 m2 m2
pto m
glb
EL COLEGIO CRISTO REY DE CAJAMARCA
Metrado
PRESUPUESTO PU (S/)
TOTAL
1.00 1.00 1.00 1.00
1,503.86 3,000.00 642.80 820.81
1,503.86 3,000.00 642.80 820.81 -
43.85
133.01
5,832.49
29.88
33.25
993.51
59.76
55.24
3,301.14
3.44
338.64
1,164.92
3.44 74.70 46.84
267.69 34.43 43.02
4.28 1.84
287.01 140.70
7.69 61.49
358.62 71.48
217.00 5.74
5.46 380.71
678.17 7.18 43.11
5.46 424.31 92.13
1,086.91 3.88 36.32
5.46 488.91 89.06
219.96 1.58 25.52
5.46 526.05 108.58
920.85 2,571.92 2,015.06 1,228.40 258.89 2,757.79 4,395.31 1,184.82 2,185.28 3,702.81 3,046.55 3,971.72 5,934.53 1,896.97 3,234.66 1,200.98 831.16 2,770.96
PESOS
0.01 0.03 0.01 0.01
0.05 0.01 0.03 0.01 0.01 0.02 0.02
0.01 0.00 0.02 0.04
0.01 0.02 0.03 0.03 0.03 0.05 0.02 0.03 0.01 0.01 0.02
1.00
8,000.00
106.32
104.03
158.80 53.84 36.32 25.52 50.88
29.24 26.11 40.41 59.37 16.31
29.88
35.87
21.29
30.90
33.97
25.85
38.60
243.27
38.60
12.78
158.80 53.84 36.32 25.52
13.21 15.12 13.21 15.15
24.00
90.86
132.00
8.25
1.00
5,376.24
8,000.00 11,060.47 4,643.31 1,405.76 1,467.69 1,515.12 829.85 1,071.80 657.86 878.12 9,390.22 493.31 2,097.75 814.06 479.79 386.63 2,180.64 1,089.00 5,376.24 115,205.81
0.07
0.10 0.04 0.01 0.01 0.01 0.01
0.01 0.01
0.01 0.08 0.00 0.02 0.01 0.00 0.00
0.02 0.01
0.05 1
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS CAJAMARCA - CAJAMARCA - CAJAMARCA
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA
1 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS
AJAMARCA - CAJAMARCA - CAJAMARCA
DESCRIPCIÓN/ ACTIVIDAD ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE CAJAMARCA EXCAVADORA CAT 336 DL
EXCAVADORA CAT 320 DL
TRACTOR DE ORUGAS CAT D6T
MINI CARGADOR CAT 246C
MOTONIVELADORA CAT 140K
RODILLO CAT CS533E
RETROEXCAVADORA CAT 420F
ZARANDA METSO ST4.8
CAMIÓN VOLQUETE 15 m3
CAMIÓN CISTERNA DE COMBUSTIBLE
CAMIÓN CISTERNA DE AGUA (5,000 GLNS.)
TORRE DE ILUMINACIÓN
PLANCHA COMPACTADORA
TENSIÓMETRO
SPARK TESTER
MAQUINA SOLDAR CUÑA
MANÓMETRO (AIR TEST)
VACUÓMETRO (VACUUM TEST)
GENERADOR ELÉCTRICO
MAQUINA DE SOLDAR EXTRUSORA
BARRA DE DESPLIEGUE
ZARANDA DE METALICA
RESUMEN SEMANAL DE EQUIPOS
AMARCA X
Escenario Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual
X
Sem 1 10/25/2021 10/31/2021
X
X
X
X
X
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 11/1/2021 11/8/2021 11/15/2021 11/22/2021 11/29/2021 12/6/2021 11/7/2021 11/14/2021 11/21/2021 11/28/2021 12/5/2021 12/12/2021
Prog. Actual Prog. Actual Prog. Actual Prog. Actual
-
-
-
-
-
-
-
-
-
-
-
-
-
-
X
X
X
Sem 8 Sem 9 Sem 10 12/13/2021 12/20/2021 12/27/2021 12/19/2021 12/26/2021 1/2/2022
X
X
Sem 11 1/3/2022 1/9/2022
X
Sem 12 1/10/2022 1/16/2022
Sem 13 1/17/2022 1/23/2022
-
-
-
-
-
-
-
-
-
-
-
-
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CR 01 - ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS CAJAMARCA - CAJAMARCA - CAJAMARCA
ITEM
1 2 3 4
5
CONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CRISTO REY DE C
- ACONDICIONAMIENTO Y MANTENIEMIENTO PABELLON DE AULAS AJAMARCA - CAJAMARCA - CAJAMARCA DESCRIPCIÓN/ ACTIVIDAD
ACONDICIONAMIENTO Y MANTENIMIENTO DE UN PABELLÓN DE CUATRO AULAS DE UN PISO DEL COLEGIO CR
OPERADOR CAPATAZ OPERARIO OFICIAL
PEÓN RESUMEN SEMANAL DE EQUIPOS
Y DE CAJAMARCA X
X
X
X
X
X
Sem 1 10/25/2021
Sem 2 11/1/2021
Sem 3 11/8/2021
Sem 4 11/15/2021
Sem 5 11/22/2021
Sem 6 11/29/2021
10/31/2021
11/7/2021
11/14/2021
11/21/2021
11/28/2021
12/5/2021
Escenario
Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual Prog. Actual
-
-
-
-
-
-
X
X
X
X
X
X
X
Sem 7 12/6/2021
Sem 8 12/13/2021
Sem 9 12/20/2021
Sem 10 12/27/2021
Sem 11 1/3/2022
Sem 12 1/10/2022
Sem 13 1/17/2022
12/12/2021
12/19/2021
12/26/2021
1/2/2022
1/9/2022
1/16/2022
1/23/2022
-
-
-
-
-
-
-