HOJA DE METRADOS PROYECT

INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALI Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION - CUSCO

UBICACIÓN:

VALLE DE MANUGALI Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION 01.04.02. CAMARAS EN LINEA DE CONDUCCION 01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 3 SALIDAS TIPO - 3

E B

A

C

D

D

Desc.

Armadura

1.00 A

Longitud por O por ML

O

Longitud (m)

Veces

1/4"

1.20

12

14.4

1/4"

1.55

8

12.4

1/4"

0.90

12

10.8

1/4"

1.55

8

12.4

1/4"

1.25

12

15

1/4"

1.55

8

12.4

1/4"

1.35

12

16.2

1/4"

1.75

10

17.5

0.55

12

6.6

1.55

7

10.85

1/4"

1.25

9

11.25

1/4"

1.15

7

8.05

1/4"

3/8"

0.20

1.55 0.70 B

0.20

1.55 0.05 1.00 C

0.20

1.55

D

1.35

1.75 0.55 E

1/4" 1.55 0.05 1.00

F

0.20

1.15 PESO POR O /ML LONG TOTAL POR DIAMETRO RESUMEN GENERAL

LONG TOTAL DE DIAMETRO PESO TOTAL POR DIAMETRO

1.00

0.25

0.56

147.85

0.00

147.85

0.00

38.85

0.00

RESUMEN GENERAL NUMERO DE VARILLAS POR DIAMETRO PESO TOTAL Kg

0.00 38.85

HOJA RESUMEN METRADOS CDC 03 SALIDAS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALI Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION - CUSCO

PROYECTO:

01.04. LINEA DE CONDUCCION 01.04.02. CAMARAS EN LINEA DE CONDUCCION 01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 3 SALIDAS TIPO - 3

PARTIDA

DESCRIPCION

UND

TOTAL METRADO

LIMPIEZA DE TERRENO MANUAL

m2

0.00

TRAZO REPLANTEO PRELIMINAR

m2

0.00

EXCAVACION EN TIERRA

m3

0.00

ELIMINACION DE MATERIAL EXCEDENTE

m3

0.00

CONCRETO f'c= 175 kg/cm2

m3

0.00

ACERO DE REFUERZO FY= 4,200 KG/CM2(1/4")

Kg

0.00

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE

m2

0.00

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4

m2

0.00

TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA 1:4

m2

0.00

PINTURA MUROS

m2

0.00

PINTURA TAPAS ANTICORROSIVO

m2

0.00

und und

0.00 0.00

ACCESORIOS Accesorios para CDC: entrada 1"; Salida 1", 3/4", 3/4" TIPO - 3 Accesorios para CDC: entrada 1"; Salida 3/4", 3/4", 3/4" TIPO - 3

HOJA RESUMEN METRADOS CAMARA DISTRIBUIDORA DE CAUDAL CONSTRUCCION DE CAPTACION DE AGUA , RESERVORIO, LÍNEA DE CONDUCCIÓN Y UNIDADES BÁSICAS DE SANEAMIENTO (UBS); ADEMÁS DE OTROS ACTIVOS EN EL(LA) SISTEMA DEL SANEAMIENTO BÁSICO INTEGRAL EN LA COMUNIDAD DE CONFORTAYOC , ZONAL DE KITENI DISTRITO DE ECHARATE, PROVINCIA LA CONVENCION, DEPARTAMENTO CUSCO

IOARR:

LINEA DE CONDUCCION CAMARAS EN LINEA DE CONDUCCION CAMARA DISTRIBUIDORA DE CAUDALES

PARTIDA

DESCRIPCION

UND

TOTAL METRADO

01.04.02.02.01

LIMPIEZA DE TERRENO MANUAL

m2

22.56

01.04.02.02.01

TRAZO REPLANTEO PRELIMINAR

m2

22.56

01.04.02.02.02

EXCAVACION EN TIERRA

m3

9.17

01.04.02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

95.35

01.04.02.02.04

CONCRETO f'c= 175 kg/cm2

m3

6.56

01.04.02.02.05

ACERO DE REFUERZO FY= 4,200 KG/CM2

Kg

272.00

01.04.02.02.06

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE

m2

90.32

01.04.02.02.07

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4

m2

55.44

01.04.02.02.08

TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA 1:4

m2

45.20

01.04.02.02.09

PINTURA MUROS

m2

43.20

01.04.02.02.10

PINTURA TAPAS ANTICORROSIVO

m2

5.76

und

8.00

ACCESORIOS 01.04.02.02.11

ACCESORIOS

HOJA DE METRADOS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALY Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION CUSCO

PROYECTO:

UBICACIÓN:

VALLE DE MANUGALY Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION

0.10 0.10

01.04.02. CAMARAS EN LINEA DE CONDUCCION 01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES

0.50

1.20

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

LINEA DE CONDUCCION SALIDA REBOSE CANTIDAD

0.10

B

2" 2"

Y

B'

0.40

3/4"

0.10

2"

0.10

1

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion Partida

Ø

Unid

No

No

Medidas

Elem

Veces

Largo

1 1 1 1 1 3 2 3 2 1 1 1 2 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 0.02 0.01

5.00 1.00 2.00 2.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.3

1

Ancho

Area

Altura

Sub

Total

Total

Metrado

ACCESORIOS TUB. PVC C-7.5 DE TUB. PVC C-10 DE TUB. PVC C-10 DE TUB. PVC C-10 DE NIPLE DE F°G° CODO DE 90 SP PVC P/AGUA DE

2" 2" 2" 3/4" 2" 2"

CODO DE 90 PVC SAL DE 2" CONO DE REBOSE 3" X 2" PVC TEE SP PVC SAL DE 2" CANASTILLA DE PVC DE CANASTILLA DE PVC DE TAPA SANIT.TP-1 0.60X0.60M. TAPA SANIT.TP-1 0.40X0.40M. CINTA TEFLON PEGAMENTO PARA PVC

LIMPIEZA DE TERRENO MANUAL

2" 3/4"

ML ML ML ML pza und und und und und und und und ROL GAL M2

ESTRUCTURA DESAGUE DE ESTRUCTURA

TRAZO REPLANTEO PRELIMINAR DESAGUE DE ESTRUCTURA

DESAGUE DE ESTRUCTURA

ELIMINACION DE MATERIAL EXCEDENTE

CONCRETO f'c= 175 kg/cm2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

2.82

m3

ESTRUCTURA

1.15 0.30 0.60

0.55 0.60

1.15

1.49

m3

1.49

M3

Loza de Techo

5.00 1.00 2.00 2.00 1.00 3.00 2.00 3.00 2.00 1.00 1.00 1.00 2.00 0.02 0.01 2.82

M2

ESTRUCTURA

EXCAVACION EN TIERRA

5.000 1.000 2.000 2.000 1.000 3.000 2.000 3.000 2.000 1.000 1.000 1.000 2.000 0.02 0.010

0.82

1 1 1 2 1 1 1

1 2 2 2 1 1 1

1.40 1.20 0.90 0.40 0.90 0.90 1.00

1.30 0.10 0.10 0.10 0.10 0.40 0.30

0.10 1.00 1.00 0.50 0.50 0.10 0.10

0.18 0.24 0.18 0.080 0.045 0.036 0.030

1

1

0.30

0.30

0.30

0.03

Dado de Concreto ACERO DE REFUERZO FY= 4,200 KG/CM2(1/4")

KG

34.00

HOJA DE METRADOS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALY Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION CUSCO

PROYECTO:

UBICACIÓN:

VALLE DE MANUGALY Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION

0.10 0.10

01.04.02. CAMARAS EN LINEA DE CONDUCCION 01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES

0.50

1.20

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

LINEA DE CONDUCCION SALIDA REBOSE CANTIDAD

0.10

B

2" 2"

Y

B'

0.40

3/4"

0.10

2"

0.10

1

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion Partida

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE PISO Y MUROS Camara Humeda Piso

Ø

Unid

No

Elem

Veces

Medidas Largo

Ancho

Area

Altura

Sub

Total

Total

Metrado

M2

11.29

2 2 1 1 1 1 2 1 1 1 1 4

Muro frontal y fondo Muro lateral Divisiones Loza de Techo Dado de Concreto

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4 MUROS Camara Humeda Piso

No

1 1 2 2 2 2 2 1 1 1 1 1

1.40 1.30 0.90 1.10 1.00 1.20 0.40 0.90 1.00 1.10 1.10 0.30

0.10 0.10 1.00 1.00 1.00 1.00 0.50 0.50

0.28 0.26 1.80 2.20 2.00 2.40 0.80 0.45 0.30 0.44

0.30

0.36

0.30 0.40

M2

6.93

1 1 2 2 1 1 1

Muro frontal y fondo Muro lateral Loza de Techo Dado de Concreto TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA 1 M2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

PINTURA MUROS MUROS Camara Humeda Muro frontal Muro lateral Loza de Techo

M2

PINTURA TAPAS ANTICORROSIVO Tapa Sanitaria TP-01 0.60x0.60

M2

2 2 1 1 1 1 5

1.40 1.30 1.10 1.20 1.20 1.10 0.30

0.20 0.20 1.00 1.00 0.30 0.40 0.30

0.56 0.52 2.20 2.40 0.36 0.44 0.45 5.65

1 2 2 1 1

1 1 1 2 1

1.00 0.90 1.00 0.50 0.90

0.90 1.00 1.00 0.50 0.50

0.90 1.80 2.00 0.50 0.45 5.40

2 2 1 1

1 1 1 1

1.10 1.20 1.20 1.10

1.00 1.00 0.30 0.40

2.20 2.40 0.36 0.44

1

2

0.60

0.60

0.72

0.72

HOJA DE METRADOS CONSTRUCCION DE CAPTACION DE AGUA , RESERVORIO, LÍNEA DE CONDUCCIÓN Y UNIDADES BÁSICAS DE SANEAMIENTO (UBS); ADEMÁS DE OTROS ACTIVOS EN EL(LA) SISTEMA DEL SANEAMIENTO BÁSICO INTEGRAL EN LA COMUNIDAD DE CONFORTAYOC , ZONAL DE KITENI DISTRITO DE ECHARATE, PROVINCIA LA CONVENCION, DEPARTAMENTO CUSCO

IOARR:

UBICACIÓN:

CONFORTAYOC

DISTRITO:

ECHARATE

LINEA DE CONDUCCION

0.10 0.10

CAMARAS EN LINEA DE CONDUCCION . CAMARA DISTRIBUIDORA DE CAUDALES

0.50

1.20

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

LINEA DE CONDUCCION

1"

SALIDA

0.10

B

REBOSE

1" Y 3/4" 2"

0.10 0.10

8

CANTIDAD

B'

0.40

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion

Ø

Partida

Unid

No

No

Elem

Veces

Largo

Medidas

1 1 1 1 1 3 2 3 2 1 1 1 2 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 0.02 0.01

5.00 1.00 2.00 2.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.3

1

Ancho

Area

Altura

Sub

Total

Total

Metrado

ACCESORIOS 2" 1" 1" 3/4" 1" 1"

TUB. PVC C-7.5 DE TUB. PVC C-10 DE TUB. PVC C-10 DE TUB. PVC C-10 DE NIPLE DE F°G° CODO DE 90 SP PVC P/AGUA DE CODO DE 90 PVC SAL DE 2" CONO DE REBOSE 3" X 2" PVC TEE SP PVC SAL DE 2"

1" 3/4"

CANASTILLA DE PVC DE CANASTILLA DE PVC DE TAPA SANIT.TP-1 0.60X0.60M. TAPA SANIT.TP-1 0.40X0.40M. CINTA TEFLON PEGAMENTO PARA PVC

LIMPIEZA DE TERRENO MANUAL

ML ML ML ML pza und und und und und und und und ROL GAL

5.000 1.000 2.000 2.000 1.000 3.000 2.000 3.000 2.000 1.000 1.000 1.000 2.000 0.02 0.010

M2 ESTRUCTURA DESAGUE DE ESTRUCTURA

TRAZO REPLANTEO PRELIMINAR

22.56

M2 ESTRUCTURA DESAGUE DE ESTRUCTURA

EXCAVACION EN TIERRA

22.56

m3 ESTRUCTURA DESAGUE DE ESTRUCTURA

ELIMINACION DE MATERIAL EXCEDENTE

CONCRETO f'c= 175 kg/cm2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

9.17 0.30 0.60

0.55 0.60

9.17

11.92

m3

95.35

M3

Loza de Techo

5.00 1.00 2.00 2.00 1.00 3.00 2.00 3.00 2.00 1.00 1.00 1.00 2.00 0.17 0.08

6.56

1 1 1 2 1 1 1

1 2 2 2 1 1 1

1.40 1.20 0.90 0.40 0.90 0.90 1.00

1.30 0.10 0.10 0.10 0.10 0.40 0.30

0.10 1.00 1.00 0.50 0.50 0.10 0.10

0.18 0.24 0.18 0.080 0.045 0.036 0.030

1

1

0.30

0.30

0.30

0.03

Dado de Concreto

ACERO DE REFUERZO FY= 4,200 KG/CM2(1/4")

KG

272.00

HOJA DE METRADOS CONSTRUCCION DE CAPTACION DE AGUA , RESERVORIO, LÍNEA DE CONDUCCIÓN Y UNIDADES BÁSICAS DE SANEAMIENTO (UBS); ADEMÁS DE OTROS ACTIVOS EN EL(LA) SISTEMA DEL SANEAMIENTO BÁSICO INTEGRAL EN LA COMUNIDAD DE CONFORTAYOC , ZONAL DE KITENI DISTRITO DE ECHARATE, PROVINCIA LA CONVENCION, DEPARTAMENTO CUSCO

IOARR:

UBICACIÓN:

CONFORTAYOC

DISTRITO:

ECHARATE

LINEA DE CONDUCCION

0.10 0.10

CAMARAS EN LINEA DE CONDUCCION . CAMARA DISTRIBUIDORA DE CAUDALES

0.50

1.20

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

LINEA DE CONDUCCION

1"

SALIDA

0.10

B

REBOSE

1" Y 3/4" 2"

0.10 0.10

8

CANTIDAD

B'

0.40

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion Partida

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE PISO Y MUROS Camara Humeda Piso

Ø

Unid

No Veces

Medidas Largo

Ancho

Area

Altura

Sub

Total

Total

Metrado

M2

90.32

2 2 1 1 1 1 2 1 1 1 1 4

Muro frontal y fondo Muro lateral Divisiones Loza de Techo Dado de Concreto

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4 MUROS Camara Humeda Piso

No Elem

1 1 2 2 2 2 2 1 1 1 1 1

1.40 1.30 0.90 1.10 1.00 1.20 0.40 0.90 1.00 1.10 1.10 0.30

0.10 0.10 1.00 1.00 1.00 1.00 0.50 0.50

0.28 0.26 1.80 2.20 2.00 2.40 0.80 0.45 0.30 0.44

0.30

0.36

0.30 0.40

M2

55.44

1 1 2 2 1 1 1

Muro frontal y fondo Muro lateral Loza de Techo Dado de Concreto TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA 1 M2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

PINTURA MUROS MUROS Camara Humeda Muro frontal Muro lateral Loza de Techo

M2

PINTURA TAPAS ANTICORROSIVO Tapa Sanitaria TP-01 0.60x0.60

M2

2 2 1 1 1 1 5

1.40 1.30 1.10 1.20 1.20 1.10 0.30

0.20 0.20 1.00 1.00 0.30 0.40 0.30

0.56 0.52 2.20 2.40 0.36 0.44 0.45 45.20

1 2 2 1 1

1 1 1 2 1

1.00 0.90 1.00 0.50 0.90

0.90 1.00 1.00 0.50 0.50

0.90 1.80 2.00 0.50 0.45 43.20

2 2 1 1

1 1 1 1

1.10 1.20 1.20 1.10

1.00 1.00 0.30 0.40

2.20 2.40 0.36 0.44

1

2

0.60

0.60

0.72

5.76

HOJA DE METRADOS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALI Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION CUSCO

PROYECTO:

UBICACIÓN:

VALLE DE MANUGALI Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION

0.10 0.10

01.04.02. CAMARAS EN LINEA DE CONDUCCION 01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES

0.50

1.20

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

0.10

B

1"

LINEA DE CONDUCCION 1"

SALIDA

Y

3/4"

0.10

2"

REBOSE

0.10

0.10

0

CANTIDAD

B'

0.40

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion

Ø

Partida

Unid

No

No

Elem

Veces

Largo

Medidas Ancho

Area

Altura

Sub

Total

Total

Metrado

ACCESORIOS TUB. PVC C-7.5 DE

2"

ML

1

1

5.00

5.000

5.00

TUB. PVC C-10 DE

1" 1" 3/4" 1" 1"

ML ML ML pza und und

1 1 1 1 3 2

1 1 1 1 1 1

1.00 2.00 2.00

1.000 2.000 2.000 1.000 3.000 2.000

1.00 2.00 2.00 1.00 3.00 2.00

und und und und und und

3 2 1 1 1 2

1 1 1 1 1 1

3.000 2.000 1.000 1.000 1.000 2.000

3.00 2.00 1.00 1.00 1.00 2.00

ROL GAL

1 1

0.02 0.01

0.02 0.010

0.00 0.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

ESTRUCTURA

1

1

1.40

1.30

0.30

0.55

DESAGUE DE ESTRUCTURA

1

1

2.50

0.40

0.60

0.60

1.3

1

0.00

0.00

TUB. PVC C-10 DE TUB. PVC C-10 DE NIPLE DE F°G° CODO DE 90 SP PVC P/AGUA DE CODO DE 90 PVC SAL DE 2" CONO DE REBOSE 3" X 2" PVC TEE SP PVC SAL DE 2"

1" 3/4"

CANASTILLA DE PVC DE CANASTILLA DE PVC DE TAPA SANIT.TP-1 0.60X0.60M. TAPA SANIT.TP-1 0.40X0.40M. CINTA TEFLON PEGAMENTO PARA PVC

LIMPIEZA DE TERRENO MANUAL

M2 ESTRUCTURA DESAGUE DE ESTRUCTURA

TRAZO REPLANTEO PRELIMINAR

0.00

M2 ESTRUCTURA DESAGUE DE ESTRUCTURA

EXCAVACION EN TIERRA

0.00

m3

ELIMINACION DE MATERIAL EXCEDENTE

CONCRETO f'c= 175 kg/cm2

0.00

m3

0.00

M3

PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones Loza de Techo

0.00

1 1 1 2

1 2 2 2

1.40 1.20 0.90 0.40

1.30 0.10 0.10 0.10

0.10 1.00 1.00 0.50

0.18 0.24 0.18 0.080

1 1 1

1 1 1

0.90 0.90 1.00

0.10 0.40 0.30

0.50 0.10 0.10

0.045 0.036 0.030

1

1

0.30

0.30

0.30

0.03

Dado de Concreto

ACERO DE REFUERZO FY= 4,200 KG/CM2(1/4")

KG

0.00

0.10 0.10

0.50

1.20 0.10

B

1"

LINEA DE CONDUCCION 1"

SALIDA

Y

3/4"

0.10

2"

REBOSE

0.10

0.10

0

CANTIDAD

B'

0.40

0.10

0.40

0.10

0.40

0.10

0.10

1.10

C'

PLANTA ESCALA: 1/20

Descripcion Partida

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE PISO Y MUROS Camara Humeda

Ø

Unid

No Veces

Medidas Largo

Ancho

Area

Altura

Sub

Total

Total

Metrado

M2

Piso Muro frontal y fondo Muro lateral Divisiones Loza de Techo Dado de Concreto

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4 MUROS Camara Humeda Piso

No Elem

0.00

2 2 1 1 1 1

1 1 2 2 2 2

1.40 1.30 0.90 1.10 1.00 1.20

0.10 0.10 1.00 1.00 1.00 1.00

0.28 0.26 1.80 2.20 2.00 2.40

2 1 1 1 1 4

2 1 1 1 1 1

0.40 0.90 1.00 1.10 1.10 0.30

0.50 0.50

0.80 0.45 0.30 0.44

0.30

0.36

0.30 0.40

M2

Muro frontal y fondo Muro lateral Loza de Techo Dado de Concreto

0.00

1 1

2 2

1.40 1.30

0.20 0.20

0.56 0.52

2 2 1 1 1

1 1 1 1 5

1.10 1.20 1.20 1.10 0.30

1.00 1.00

2.20 2.40 0.36 0.44 0.45

0.30 0.40 0.30

TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA M2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

PINTURA MUROS MUROS Camara Humeda Muro frontal

1 2 2 1

1 1 1 2

1.00 0.90 1.00 0.50

1

1

0.90

0.90 1.00 1.00 0.50

0.90 1.80 2.00 0.50

0.50

0.45

M2

Muro lateral Loza de Techo

PINTURA TAPAS ANTICORROSIVO Tapa Sanitaria TP-01 0.60x0.60

0.00

0.00

2

1

1.10

1.00

2.20

2 1 1

1 1 1

1.20 1.20 1.10

1.00 0.30 0.40

2.40 0.36 0.44

1

2

0.60

0.60

0.72

M2

0.00

HOJA DE METRADOS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALI Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION CUSCO

PROYECTO:

UBICACIÓN:

VALLE DE MANUGALI Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION 0.10

01.04.02. CAMARAS EN LINEA DE CONDUCCION

0.10

01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES 0.50

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

1.20 0.10

B

B'

0.40

1"

LINEA DE CONDUCCION

0.10

3/4"

SALIDA

Y

3/4"

0.10

2"

REBOSE

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

0

CANTIDAD

C'

PLANTA ESCALA: 1/20

Descripcion

Ø

Partida

Unid

No

No

Elem

Veces

Largo

Medidas

ML ML ML ML pza und

1 1 1 1 1 3

1 1 1 1 1 1

5.00 1.00 2.00 2.00

und und und und und und

2 3 2 1 1 1

und ROL GAL

Ancho

Area

Altura

Sub

Total

Total

Metrado

ACCESORIOS 2" 1" 3/4" 3/4" 1" 1"

TUB. PVC C-7.5 DE TUB. PVC C-10 DE TUB. PVC C-10 DE TUB. PVC C-10 DE NIPLE DE F°G° CODO DE 90 SP PVC P/AGUA DE CODO DE 90 PVC SAL DE 2" CONO DE REBOSE 3" X 2" PVC TEE SP PVC SAL DE 2"

3/4" 3/4"

CANASTILLA DE PVC DE CANASTILLA DE PVC DE TAPA SANIT.TP-1 0.60X0.60M. TAPA SANIT.TP-1 0.40X0.40M. CINTA TEFLON PEGAMENTO PARA PVC

LIMPIEZA DE TERRENO MANUAL

5.000 1.000 2.000 2.000 1.000 3.000

5.00 1.00 2.00 2.00 1.00 3.00

1 1 1 1 1 1

2.000 3.000 2.000 1.000 1.000 1.000

2.00 3.00 2.00 1.00 1.00 1.00

2 1 1

1 0.02 0.01

2.000 0.02 0.010

2.00 0.00 0.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.82 1.00

1 1

1 1

1.40 2.50

1.30 0.40

1.3

1

M2 ESTRUCTURA DESAGUE DE ESTRUCTURA

TRAZO REPLANTEO PRELIMINAR

0.00

M2 ESTRUCTURA

DESAGUE DE ESTRUCTURA

EXCAVACION EN TIERRA

0.00

m3 ESTRUCTURA DESAGUE DE ESTRUCTURA

ELIMINACION DE MATERIAL EXCEDENTE

CONCRETO f'c= 175 kg/cm2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral

0.00 0.30 0.60

0.55 0.60

0.00

0.00

m3

0.00

M3

Divisiones Loza de Techo

0.00

1 1 1

1 2 2

1.40 1.20 0.90

1.30 0.10 0.10

0.10 1.00 1.00

0.18 0.24 0.18

2 1 1 1

2 1 1 1

0.40 0.90 0.90 1.00

0.10 0.10 0.40 0.30

0.50 0.50 0.10 0.10

0.080 0.045 0.036 0.030

1

1

0.30

0.30

0.30

0.03

Dado de Concreto

ACERO DE REFUERZO FY= 4,200 KG/CM2(1/4")

KG

0.00

HOJA DE METRADOS INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN EL SECTOR DE VALLE DE MANUGALI Y NUEVO ECHARATE, ZONAL IVOCHOTE, DISTRITO DE ECHARATE - LA CONVENCION CUSCO

PROYECTO:

UBICACIÓN:

VALLE DE MANUGALI Y NUEVO ECHARATE

DISTRITO:

ECHARATE

01.04. LINEA DE CONDUCCION 0.10

01.04.02. CAMARAS EN LINEA DE CONDUCCION

0.10

01.04.02.02. CAMARA DISTRIBUIDORA DE CAUDALES 0.50

ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 2 SALIDAS TIPO - 2

1.20 0.10

B

B'

0.40

1"

LINEA DE CONDUCCION

0.10

3/4"

SALIDA

Y

3/4"

0.10

2"

REBOSE

0.10

0.10

0.40

0.10

0.40

0.10

0.10

1.10

0

CANTIDAD

C'

PLANTA ESCALA: 1/20

Descripcion Partida

ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE

Ø

Unid

Muro frontal y fondo Muro lateral Divisiones Loza de Techo Dado de Concreto

Dado de Concreto TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM ME M2 PISO Y MUROS Camara Humeda Piso Muro frontal y fondo Muro lateral Divisiones

Ancho

Area

Altura

Sub

Total

Total

Metrado

0.00

2 2 1 1

1 1 2 2

1.40 1.30 0.90 1.10

0.10 0.10 1.00 1.00

0.28 0.26 1.80 2.20

1 1 2 1 1 1

2 2 2 1 1 1

1.00 1.20 0.40 0.90 1.00 1.10

1.00 1.00 0.50 0.50

2.00 2.40 0.80 0.45 0.30 0.44

1 4

1 1

1.10 0.30

0.30

0.36

0.30 0.40

0.00

1

2

1.40

0.20

0.56

1 2 2 1 1 1

2 1 1 1 1 5

1.30 1.10 1.20 1.20 1.10 0.30

0.20 1.00 1.00

0.52 2.20 2.40 0.36 0.44 0.45

0.30 0.40 0.30

0.00

1 2

1 1

1.00 0.90

2 1 1

1 2 1

1.00 0.50 0.90

0.90 1.00

0.90 1.80

1.00 0.50 0.50

2.00 0.50 0.45

M2

Camara Humeda Muro frontal Muro lateral Loza de Techo

PINTURA TAPAS ANTICORROSIVO Tapa Sanitaria TP-01 0.60x0.60

Medidas Largo

M2

Muro frontal y fondo Muro lateral Loza de Techo

PINTURA MUROS MUROS

No Veces

M2

PISO Y MUROS Camara Humeda Piso

TARRAJEO EXTERIOR E=1.5 CM MEZCLA 1:4 MUROS Camara Humeda Piso

No Elem

0.00

2 2 1 1

1 1 1 1

1.10 1.20 1.20 1.10

1.00 1.00 0.30 0.40

2.20 2.40 0.36 0.44

1

2

0.60

0.60

0.72

M2

0.00

HOJA DE METRADOS CONSTRUCCION DE CAPTACION DE AGUA , RESERVORIO, LÍNEA DE CONDUCCIÓN Y UNIDADES BÁSICAS DE SANEAMIENTO (UBS); ADEMÁS DE OTROS ACTIVOS EN EL(LA) SISTEMA DEL SANEAMIENTO BÁSICO INTEGRAL EN LA COMUNIDAD DE CONFORTAYOC , ZONAL DE KITENI DISTRITO DE ECHARATE, PROVINCIA LA CONVENCION, DEPARTAMENTO CUSCO

IOARR:

UBICACIÓN:

CONFORTAYOC

DISTRITO:

ECHARATE

LINEA DE CONDUCCION . CAMARAS EN LINEA DE CONDUCCION CAMARA DISTRIBUIDORA DE CAUDALES ESTRUCTURA: CAMARA DISTRIBUIDORA DE CAUDALES 02 SALIDAS TIPO - 2

E B

A

C

D

D

Desc.

Armadura

Longitud (m)

Veces

1/4"

1.20

9

10.8

1/4"

1.05

8

8.4

1/4"

0.90

9

8.1

1/4"

1.05

8

8.4

1/4"

1.25

9

11.25

1/4"

1.05

8

8.4

1/4"

1.35

9

12.15

1/4"

1.25

10

12.5

0.45

6

2.7

0.55

0.55

6

3.3

1.05

1.05

6

6.3

1.15

5

5.75

1/4"

1.25

14

17.5

1/4"

1.15

14

16.1

1.00 A

Longitud por O por ML

O

1/4"

3/8"

0.20

1.05

0.70 B

0.20

1.05 0.05 1.00 C

0.20

1.05

D

1.35

1.25 0.45 1/4" E

1/4" 1.15 0.05 1.00 F

0.20

1.15 PESO POR O /ML LONG TOTAL POR DIAMETRO RESUMEN GENERAL

LONG TOTAL DE DIAMETRO

1.00

0.25

0.56

131.65

0.00

131.65

0.00

RESUMEN GENERAL PESO TOTAL POR DIAMETRO

34.00

NUMERO DE VARILLAS POR DIAMETRO PESO TOTAL Kg

0.00 0.00

34.00

Similar documents

08.- Camara Distribui Caudal

lucas lauraesquivel - 386.5 KB

TAREA CAUDAL

brayan - 538.2 KB

DETERMINE CAUDAL DE DISEÑO

RAKELI - 71.2 KB

Tarea 08 09

ezm lostwolf0 - 76.4 KB

FINAL INT 08 V001

Gokú Del Universo 7 - 90.5 KB

ACT.08 (03 AeC) (1)

Cinthia Cachay - 725.6 KB

Economics Jul 08, 2021

Pranay Choudhary - 1.8 MB

2021 08 Entrepreneur Middle East

sofiane 1993 - 31.5 MB

Doc Jul 08 2020(1)

- 369.8 KB

jurnal (08-06-18-05-39-42)

Sigit Ariyanto - 179.5 KB

© 2024 VDOCS.RO. Our members: VDOCS.TIPS [GLOBAL] | VDOCS.CZ [CZ] | VDOCS.MX [ES] | VDOCS.PL [PL] | VDOCS.RO [RO]